3D Personnel Ltd
Design Manager - Data Centre Construction
Design Manager - Data Centre Construction at 3D Personnel Ltd, based in Derby, East Midlands. This is a temporary role.
- Pay
- Not given by the employer
- Hours and contract
- Temporary · On site
- Location
- Derby, East Midlands
- Closing date
- Sector
- Graphic Designer
Reference 643277509810395002
About the role
Design Manager - Data Centre Construction
Location: Blyth, Northumberland
Our client is seeking an experienced Design Manager to oversee the coordinated delivery of CSA and MEP design packages on a major data centre development in Blyth.
The Role
- Manage the in-house design team and external engineering and architectural consultants
- Coordinate CSA and MEP design packages throughout the construction programme
- Oversee technical submittals, RFIs, IFC drawing releases and design deliverables
- Maintain the design risk register and ensure compliance with Safety in Design requirements
- Coordinate OFCI vendor information and integration into the wider design
- Support LEED requirements and sustainability-related design obligations
- Liaise with temporary works teams and construction managers to resolve design interfaces
- Manage design coordination meetings and ensure technical issues are resolved to programme
Candidate Requirements
- 8+ years' experience managing design delivery on major construction projects
- Degree in Engineering, Construction Management or a related discipline
- Strong experience coordinating multidisciplinary CSA and MEP design
- Excellent understanding of construction documentation, design risk and technical compliance
- Confident managing design consultants, subcontractors and internal project teams
- Data centre experience highly desirable, although candidates from major industrial, pharmaceutical or similarly complex projects will be considered
Location & Travel
Preference will be given to candidates living within 60 miles of Blyth, followed by those within 90 miles.
- Qualifying candidates living over 60 miles from site may receive Monday to Thursday accommodation and a £160 weekly tax-free allowance, subject to satisfactory proof of address and applicable tax rules.
- Flights and accommodation are also available for suitable candidates travelling from Ireland or mainland Europe on a 10 days on / 4 days off rotation.
#J-18808-Ljbffr
Reference: 643277509810395002 · Posted 3 days ago · Closes 2 Dec 2026 · Listed via 3D Personnel Ltd
Apply for this job
This role is listed via 3D Personnel Ltd. Applications are handled on the employer's site.
Apply on employer siteOpens the employer's website in a new tab.
Signed in? Every job you apply for counts toward your weekly goal and badges. How it works
Safe applying: a genuine employer will never ask you to pay for a DBS check, training or equipment, or move you onto WhatsApp before you are hired. If this listing does, report it and do not pay anything.